Your builder is removing the rear addition, but the original house and a wall close to the boundary are staying. What condition should you document before the first work starts? Agree on the retained areas, adjoining property and access route before deciding how wide the report needs to be.

Boroondara’s published agenda includes a Camberwell example involving partial demolition and an extension to a heritage dwelling. That is a useful reminder to check what is being retained and what approvals apply to the individual property. City of Boroondara planning agenda

Draw the scope on the demolition plan

Use three marks on a copy of the plan. Mark retained parts of the project property, adjoining areas proposed for recording, and access routes. Discuss which rooms or structures are close enough to the proposed work to justify including in the scope. Photographing a crack up close is useful when the report also shows where it is, which way the camera faced and how to find the same spot later.

For a rear extension, useful areas might include the existing hallway where the addition joins the house, the side path used to remove material and the neighbouring garage wall near the excavation. If the neighbour agrees to exterior access only, write that limitation into the scope. Agree who may receive the report and photos before access is arranged. See the guide to limited neighbour access.

Book before the first work that changes the condition

A baseline before excavation may still come too late to record a gate pier removed during site establishment. Ask the builder what is being removed first, where equipment will travel and when access changes. Tell the inspector if any early work has already occurred so the dates can be recorded accurately.

Illustrative example. Before demolition, the inspector records a repaired plaster crack at the junction of the retained dining room and the rear addition. A wide photo locates the wall and a closer image shows the patch. After excavation, the owner reports a line near the same point. A comparison inspection may help identify visible differences from the dated baseline. Determining why a change occurred can require construction records, measurements or an engineer’s assessment.

Confirm whether protection work applies

Ask the relevant building surveyor whether protection work is required for the project. Where the Victorian process applies, it has separate requirements, including an agreed adjoining-property condition survey. Discuss whether the proposed inspection scope meets the surveyor’s requirements before booking. BPC guidance on protecting adjoining properties

Discuss a Camberwell dilapidation report. Send the project and adjoining addresses, a demolition or excavation plan if available, the first disturbance date and who can arrange access. See what a dilapidation inspection covers for more on baseline scope.